Babadag Wind Farm

Wind farm in Romania
44°54′06″N 28°41′23″E / 44.90167°N 28.68972°E / 44.90167; 28.68972StatusOperationalConstruction beganApril, 2010Commission date2011Construction cost€23 millionOwner(s)MartiferOperator(s)Eviva NalbantWind farm TypeOnshoreHub height79 m (259 ft)Rotor diameter88 m (289 ft)Site area260 ha (640 acres)Site elevation70–180 m (230–590 ft)Power generation Units operational20 X 2.1 MWMake and modelSuzlon Energy: Suzlon S88Nameplate capacity42 MW
[edit on Wikidata]

The Babadag Wind Farm (also referred as Renewable Energy Production Facilities in Babadag; Romanian: Parc Eolian Babadag) is a wind farm in Babadag, Tulcea County, Romania. The wind farm is owned and operated by Eviva Nalbant, a subsidiary of Portuguese multinational company Martifer.[1] The project was developed as a joint implementation project.[2] The wind park was financed with €23 million loan from Banca Comercială Română.[3]

The project started in 2007 when Eviva Nalbant conducted a preliminary wind resource assessment and pre-feasibility assessment. The concession contract with Babadag Municipality was signed in September 2007. In 2008, a turbine supply contract was signed with Suzlon Energy. In April 2009, the project was revised and optimized based on on-site measurement data. A construction permit was issued in March 2010 and construction started in April 2010.[2]

The wind farm is located on 260 hectares (640 acres).[4] It contains two locations: Babadag I (16 turbines) and Babadag II (four turbines).[2] Originally, the project was to include 48 wind turbines with a nominal capacity 1 MW each.[1] However, the project was delayed and it was later change to have 20 Suzlon S88 turbines with a nameplate capacity of 2.1 MW each.[2][5] The hub-height is 79 metres (259 ft) and the rotor diameter is 88 metres (289 ft).[2]

References

  1. ^ a b "Eoliene la Babadag" [Wind energy in Babadag]. Babadag Live (in Romanian). 25 March 2010. Retrieved 14 March 2012.
  2. ^ a b c d e Renewable Energy Production Facilities in Babadag, Tulcea, Track I (PDF) (Report). UNFCCC. 2010. Retrieved 14 March 2012.
  3. ^ "Martifer Announces Project Financing Of $34 Million For Babadag Wind Power Project, Romania". ResearchViews. 2011-04-26. Archived from the original on 5 March 2016. Retrieved 14 March 2012.
  4. ^ "Martifer a concesionat 260 de hectare la Babadag, pentru un parc eolian" [Martifer has leased 260 hectares in Babadag for a wind farm]. ZF 24 (in Romanian). 22 October 2007. Retrieved 2012-03-14.
  5. ^ "Verbund initiates construction of first section of Casimcea wind park". The Diplomat. 12 March 2012. Retrieved 12 March 2012.
  • flagRomania portal
  • iconWeather portal
  • iconRenewable energy portal
  • v
  • t
  • e
≥ 100 MW
50-100 MW
≤ 50 MW
icon Wind power portal