Kampung Batu station
Preceding station | Keretapi Tanah Melayu (Komuter) | Following station | ||
---|---|---|---|---|
Taman Wahyu towards Batu Caves | Batu Caves–Pulau Sebang Line | Batu Kentonmen towards Pulau Sebang/Tampin | ||
Preceding station | Following station | |||
Sri Delima towards Kwasa Damansara | Putrajaya Line | Kentonmen towards Putrajaya Sentral |
The Kampung Batu station is a Malaysian commuter and Rapid transit train station located in the west side of and named after the village of Kampung Batu (Batu Village) in northern Kuala Lumpur, Malaysia. It was built on the location of the disused colonial-era Batu Village railway station. The station is served by the KTM Komuter Seremban Line and the Putrajaya Line
KTM Komuter
History
The station was constructed between the Batu Caves and the Sentul railway stations as part of a single-track, unelectrified line. It fell into disuse as with the rest of the portion of the railway line from Sentul to Batu Caves. During the Sentul Raya masterplan by YTL Corporation Berhad, the Kampung Batu station was demolished, and rebuilt for the KTM Komuter Port Klang-Sentul line extension.
Upon completion in July 2010, the station was served by the Port Klang Line which ran from Port Klang to Batu Caves. In December 2015, following a change in the services of the KTM Komuter, the portion of the railway line between Sentul and Batu Caves stations including Kampung Batu station was transferred to the Seremban Line, with trains now running between Pulau Sebang/Tampin and Batu Caves stations.
MRT Putrajaya Line
History
A station serving the Putrajaya line was constructed next to the existing KTM Komuter station. Under Phase One operations of the line, this station is temporarily the last station on the line, pending completion of the Kampung Batu-Putrajaya stretch.
The Kampung Batu MRT station commenced operations on 16 June 2022 at 3pm.
Feeder buses
Go KL City Bus MAROON (to Sentul LRT station) and Rapid KL T120 (Jalan Kampung Batu exit) and173 serve here.
External links
- KL MRT Integration with KTM Komuter Station
3°12′17″N 101°40′32″E / 3.20472°N 101.67556°E / 3.20472; 101.67556
- v
- t
- e
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- B1
- Batu Caves
- Taman Wahyu
- Kampung Batu
- Batu Kentonmen
- Sentul
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Mid Valley
- Seputeh
- Bandar Malaysia South (planned)
- Salak Selatan
- Bandar Tasik Selatan
- Maju KL (planned)
- Serdang
- Kajang
- Kajang 2
- UKM
- Bangi
- Batang Benar
- Nilai
- Labu
- Tiroi
- Seremban
- Senawang
- Sungai Gadut
- Rembau
- Pulau Sebang/Tampin
- Tanjung Malim
- Kuala Kubu Bharu
- Rasa
- Batang Kali
- Serendah
- Rawang
- Kuang
- Sungai Buloh
- Kepong Sentral
- Kepong
- Segambut 2 (future)
- Segambut
- Putra
- Bank Negara
- Kuala Lumpur
- KL Sentral
- Abdullah Hukum
- Angkasapuri
- Pantai Dalam
- Petaling
- Jalan Templer
- Kampung Dato Harun
- Seri Setia
- Setia Jaya
- Subang Jaya
- Batu Tiga
- Shah Alam
- Padang Jawa
- Bukit Badak
- Klang
- Teluk Pulai
- Teluk Gadong
- Kampung Raja Uda
- Jalan Kastam
- Port Klang
- Sentul Timur
- Sentul
- Titiwangsa
- PWTC
- Sultan Ismail
- Bandaraya
- Masjid Jamek
- Plaza Rakyat
- BBCC–Hang Tuah
- Pudu
- Chan Sow Lin
- Cheras
- Salak Selatan
- Bandar Tun Razak
- Bandar Tasik Selatan
- Sungai Besi
- Bukit Jalil
- Sri Petaling
- Awan Besar
- Muhibbah
- Alam Sutera
- Kinrara BK5
- Kinrara BK3 (planned)
- IOI Puchong Jaya
- Pusat Bandar Puchong
- Taman Perindustrian Puchong
- Bandar Puteri
- Puchong Perdana
- Puchong Prima
- Kampung Sri Aman (planned)
- Putra Heights
- Gombak
- Taman Melati
- Wangsa Maju
- Sri Rampai
- Setiawangsa
- Jelatek
- Dato' Keramat
- Damai
- Ampang Park
- KLCC
- Kampung Baru
- Dang Wangi
- Masjid Jamek
- Pasar Seni
- KL Sentral–redONE
- Bank Rakyat–Bangsar
- Abdullah Hukum
- Kerinchi
- Universiti
- Taman Jaya
- Asia Jaya
- Taman Paramount
- Taman Bahagia
- Kelana Jaya
- Lembah Subang
- Ara Damansara
- CGC–Glenmarie
- Subang Jaya
- SS15
- SS18
- USJ 7
- Taipan
- Wawasan
- USJ 21
- Alam Megah
- Subang Alam
- Putra Heights
- Kwasa Damansara
- Kwasa Sentral
- Kota Damansara–Thomson Hospital
- Surian
- Mutiara Damansara
- Bandar Utama
- Taman Tun Dr Ismail–Deloitte (TTDI)
- Phileo Damansara
- Bukit Kiara Selatan (planned)
- Pavilion Damansara Heights–Pusat Bandar Damansara
- Semantan
- Muzium Negara
- Pasar Seni
- Merdeka
- Pavilion Kuala Lumpur–Bukit Bintang
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Cochrane
- AEON–Maluri
- Taman Pertama
- Taman Midah
- Taman Mutiara
- Taman Connaught
- Taman Suntex
- Sri Raya
- Bandar Tun Hussein Onn
- Batu 11 Cheras
- Bukit Dukung
- Sungai Jernih
- Stadium Kajang
- Kajang
|
Phase 1 Opening 2025 | |
---|---|
Phase 2 |
- Kwasa Damansara
- Rubber Research Institute (planned)
- Kampung Selamat
- Sungai Buloh
- Damansara Damai
- Sri Damansara Barat
- Sri Damansara Sentral
- Sri Damansara Timur
- Metro Prima
- Kepong Baru
- Jinjang
- Sri Delima
- Kampung Batu
- Kentonmen
- Jalan Ipoh
- Sentul Barat
- Titiwangsa
- Hospital Kuala Lumpur
- Raja Uda–UTM
- Ampang Park
- Persiaran KLCC
- Conlay–Kompleks Kraf
- Tun Razak Exchange–Samsung Galaxy (TRX)
- Chan Sow Lin
- Bandar Malaysia Utara (planned)
- Bandar Malaysia Selatan (planned)
- Kuchai
- Taman Naga Emas
- Sungai Besi
- Technology Park (planned)
- Serdang Raya Utara
- Serdang Raya Selatan
- Serdang Jaya
- UPM
- Taman Universiti (planned)
- Taman Equine
- Putra Permai
- 16 Sierra
- Cyberjaya Utara–Finexus
- Cyberjaya City Centre–Limkokwing
- Putrajaya Sentral
Opening 2028-2030 |
|
---|