Planned railway line in China
4 ft 8+1⁄2 in)
standard gaugeOperating speed | 350 km/h (217 mph) |
The Second Chengdu–Chongqing high-speed railway (Chinese: 成渝中线高铁; lit. 'Chengdu–Chongqing Central line high-speed railway') is a 292-kilometre (181 mi)[1] long high-speed rail line that connects the cities of Chengdu (in Sichuan Province) and Chongqing in southwestern China, with a maximum speed of 350 km/h (220 mph). It will head via Lezhi, Anyue, and Dazu. Construction started on September 26, 2021 [2] and it is expected to open in 2027.
The 292 kilometres (181 mi) long Second Chengdu–Chongqing high-speed railway will take a more direct route than the existing 307 kilometres (191 mi) long high-speed Chengdu–Chongqing intercity railway and is expected to reduce journey times between the two cities to 50 minutes.[2]
History
Approval for the 69.273 billion yuan project was granted on August 17, 2021 by the National Development and Reform Commission.[1]
Construction started on September 26, 2021.[2]
Stations
Other railways between Chengdu and Chongqing
The first railway between the two cities was the Chengdu–Chongqing railway, completed in the 1950s.[5] The Suining–Chengdu railway and Suining–Chongqing railway form a route between the two cities which was completed in 2006. The fastest journeys on this line take just over two hours. The Chengdu–Chongqing intercity railway was completed in 2015.
References
- ^ a b c "国家发展改革委关于新建成渝中线铁路(含十陵南站)可行性研究报告的批复". National Development and Reform Commission.
项目总投资692.73亿元,其中工程投资678.93亿元,动车组购置费13.8亿元
- ^ a b c "成渝中线高铁启动建设 成渝两地未来将实现高铁50分钟通达". 2021-09-26. Archived from the original on 2021-09-26.
- ^ "成渝中线高铁获批 重庆境内新建设科学城等站". 2021-08-25.
全线共设站8座,线路从重庆北站引出,沿线新设科学城站、铜梁站、大足石刻站、安岳站、乐至站、简州站,接入成都站
- ^ a b "成渝中线高铁预留时速400公里/时 将新建7座车站".
- ^ "新中国档案:成渝铁路--新中国的第一条铁路" 2009-08-11
Chengdu Metro | Lines in operation | - 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 17
- 18
- 19
|
---|
Under construction | - 8 (phase II)
- 10 (phase III)
- 13
- 17 (phase II)
- 18 (phase III)
- 27
- 30
- S3
- S5
- S11
|
---|
Planned | - 5 (phase III)
- 9 (phase II)
- 10 (phase IV)
- 12
- 16
- 18 (phase IV)
- 20
- 22
- 23
- 27 (phase II)
|
---|
|
---|
Guang'an Metro | Under construction | |
---|
Planned | |
---|
|
---|
Yibin ART | Lines in operation | |
---|
Under construction | |
---|
|
---|
C-train | |
---|
Intercity rails | |
---|
Chengdu Trams | Lines in operation | |
---|
Under construction | |
---|
Under planning | |
---|
|
---|
Other rail transits | |
---|
Chengdu BRT | Lines in operation | - Line K1 / Line K1A (clockwise)
- Line K2 / Line K2A (anticlockwise)
- Line K3
- Line K5
- Line K11
- Line K12
- Line K13
- Line K16
|
---|
|
---|
Transportation hubs | Int'l airports | |
---|
Railway stations | |
---|
|
---|
- China: AH
- BJ
- CQ
- FJ
- GD/HK/MO
- GS
- GX
- GZ
- HA
- HB
- HE
- HI
- HL
- HN
- JL
- JS
- JX
- LN
- NM
- NX
- QH
- SC
- SD
- SH
- SN
- SX
- TJ
- XJ
- XZ
- YN
- ZJ
|
Public transportation in Chongqing Metropolitan Area (CQ) |
---|
Chongqing Rail Transit | Lines in operation | - Loop
- 1
- 2
- 3
- 4
- 5
- 6
- 9
- 10
- 18
- Jiangtiao
|
---|
Under construction | - 4 (Western extension)
- 6 (Eastern extension)
- 7
- 15 (Phases 1 & 2)
- 17
- 18 (Phase 2)
- 24 (Phase 1)
- 27
- Jiangtiao (Remaining section)
- Bitong
- Yongchuan (suspended)
- Yuhe
|
---|
Planned | - 7
- 8
- 11
- 12
- 13
- 14
- 16
- 17
- 19
- 20
- 21
- 22
- 23
- 25
- 26
- 28
- 29
|
|
---|
|
---|
Trams in Chongqing | |
---|
CR C-train (intercity rail) | |
---|
CR G-train (high-speed rail) | |
---|
Transportation hubs | Airports | |
---|
Railway stations | |
---|
|
---|
- China: AH
- BJ
- CQ
- FJ
- GD/HK/MO
- GS
- GX
- GZ
- HA
- HB
- HE
- HI
- HL
- HN
- JL
- JS
- JX
- LN
- NM
- NX
- QH
- SC
- SD
- SH
- SN
- SX
- TJ
- XJ
- XZ
- YN
- ZJ
|
|
---|
High-speed demonstrative maglev |
---|
|
|
|
|
---|
Intercity and long-distance | |
---|
Regional intercity | |
---|
Upgraded old lines | |
---|
|
|
|
- Italics: under construction or currently not operational
- (-), Place A-: section under construction or currently not operational
- §: in/related to Hong Kong, Macau, Taiwan
- (Place A–Place B): share tracks with other lines
|